Right Wing Skeleton Part Two (3 hr)

This day was pretty much about assembling the rest of the skeleton ready for riveting. In this picture you can see that the rear channel angle has been drilled on top of the rear channel.

The rear root doubler goes inside the rear channel

The spar tip gets added to the end of the spar

The root ribs get drilled into place and the root rib doubler cut to size and attached to the ribs

On the left wing I followed the photo guides and left the l-angles for the flaperon arms until after the rear ribs were on the skeleton. You may recall this did not work out well so this time I followed the video’s advice and cut and drilled them now.

Everything was ready now for priming and deburring but I’ll do that tomorrow.