Month: September 2011

Day 63: New Nose Skin Number 1 (1h 30m)

Today I drilled holes in the first nose skin to match the existing ones in the spar and ribs. I deburred the holes and then drew a line 10mm from the edge of the holes and used the snips to…

Day 61: Complete Flaperons Repairs (2 hr)

During the week, a new box arrived from Zenith: This box contained my replacement nose skins for the horizontal tail: And some 3-way LED lights for the wing tips. These lights can do the strobes, the nav lights, and position…