Month: September 2012

Nav Lights Mounting Bracket (1 hr)

(It doesn’t look like I uploaded any pictures of this yet, stand by) Another hot day so I tinkered about with the nav lights, drilling the holes for the mounting bracket through the wing tip. Pretty easy stuff, put the…

Nose Skins and Wing Tips (2 hr)

Still very hot but much more of a “dry heat” so I stole a few moments this weekend to progress the wings along. First, I had a go at tightening the tip end of the o/b nose skin as it…

Inboard Nose Skin (45m)

It’s still very much too hot to be building but the wing has been taunting me for weeks so I asked Teri to help fold over the nose skin today so that it would start to look like a wing.…