The wing skeleton has a rear channel that is made up of two channels that get joined in the middle together with the strut attach bracket. A angle bracket is then attached to one of the channels (I forget which…
Month: November 2011
Day 70: Wing Ribs and Tiedown Hook (3hr)
The big news is that my Dad is in town for the rest of this year and although he initially appeared hesitant to get involved on the project, once he saw what was needed he seemed very much into it.…
Day 69: Wing Spar (20m)
Back after a little break with some small amount of wing building. We had a new floor put down in our living room and we needed the garage space for furniture so I had to break everything down, put things…
Some Interesting Stats
This month’s issue of Kit Planes has a directory of kit planes including stats on the 750: Time to buold: 350 hrs Estimated completed cost: $38-65K No completed and flown: 45 Maybe I am further along than I thought.
100 Hours
Somewhat coincidentally, the finishing of the tail came at 100 hours into the project. So far I have completed: the rudder the horizontal stabilizer the elevator the slats the flaperons and have started on the wings by assembling the slat…