Month: January 2012

Fuel Sender Install (2hr 30m)

I’d been putting this off long enough, time to cut the hole for the fuel sender. I had already marked the rough position of the lightening hole in the rib, so then it was just marking the centre location for…

Fuel Tank Prep (3h 30m)

And now for something completely different: the fuel tank. And this really is something totally new, I have no idea how these things work (other than fill with fuel, fly plane until empty). The fuel tank is held in place…

O/B Top Skin Riveting (90m)

One of those days where you feel good – riveting!! First though, I drilled some holes in the rear channel for the pitot tubing and ran it from the tubes out through the trailing edge This allowed me to close…

Strut Doubler (30m)

The strut on the bottom of the wing gets a doubler for strength (I presume) and this is made from a pre-fabricated strut angle and a gusset. The first task was to position the strut angle and back drill into…

Deburring and Pitot Tube Installation (1hr 50m)

Started out with 90 minutes of deburring all the holes associated with the top skins, nose skins, trailing edge, ribs, channels, and spar. Not much more to say about that. Before riveting the skins on we have to put a…