Tail Kit and Slats/Flaperons Kit Arrives!

Phase 2 of the build began this weekend with the arrival of the next two kits: the Horizontal Tail kit, and the Slats and Flaperons kit. Even though I knew how big the parts were I hadn’t really been prepared for the size of the crate; that thing was huge! I can’t begin to immagine the wings or fuselage crates.

I pushed the crate into the dog run for storage and it wasn’t until a couple of days that we opened it up. Why? First we need to build a new bench that was big enough for the tail kit.

Inside the crate was A LOT of paper packing and an envelope with three pages of inventory part, including a line item of “800 A4 rivets”! Ugh, time to get a compressor for the air gun!!

In other updates I’ve added an extra link in the Documents section in the top right: a new spreadsheet that shows all the time worked on various parts. I’d like to direct link the totals for cost and time but so far I haven’t found a way to do that.

Hopefully I’ll be taking inventory this weekend and sorting out the slats kit parts which is what I aim to work on first.