Main Gear (3 h)

More excitement today, moving on to the main gear (even though I didn’t finish the nose gear yet) and I get to use a new tool. Enter stage left: a rotary grinder/rotary angle. But first I identified the front of…

Nose Gear and Cabin Side (3.5 h)

My wife’s uncle had offered some help so I booked him for the afternoon on the idea that I would have everything prepped on the nose gear for his arrival. Of course, everything takes longer than I think (even with…

Gear Strut Fittings (2 h)

Its not often I find myself wishing a small child was around but today was one of those times. The reason – clearances for accessing the backs of the bolts for the gear strut fittings are very small, especially for…

Forward Fuselage (4 h)

Yesterday my compressor got sick, every time the tank fills with air the safety valve opens so it was a short day as I couldn’t do any of the gear strut drilling that still remained. We took it to a…