It won’t be too long before I want to put the tail on so in preparation for that I had to go back and finishing mounting the stabilizer to the elevator. Putting the two together showed that there was interference…
Author: admin
Front Torque Tube Bearing (1 hr)
Didn’t get much done this holiday weekend but a little progress here and there. I riveted the fairing into the bearing support And then I back drilled into the torque tube bearing supports to position them on the seat channel.…
Front Torque Tube Bearing (1 hr)
Time to get on to the controls and that starts with some work on the torque tube installation. First off, though, in preparation for control cable making I bought a swaging tool from Lowes. This $20 item is a bargain…
Rudder Pedals and Brakes (2 h)
After putting the wheels on, it almost feels like the project is “done”, should take it easy for a while. Or maybe its because the next things are scary, wiring up the controls and putting on an engine are definitely…
On The Wheels (4 h)
MILESTONE DAY! Today I was joined by two “Alans”, my wife’s uncle Allen and her brother in law Alan and I was sure glad of their knowledge and assistance as finishing the wheels was trickier (and of course lengthier) that…