Day 46: Trim Tab Channel Placement (40m)

The Trim Tab Channel fits inside the skin and provides a place for the Trim Tab hinge to attach. I removed the tip rib and then pushed the channel into position and noted that the edge overlapped where the tip…

Day 44: Hinge Pins and Tip Ribs (1hr 15m)

The Tip Ribs have a hinge pin installed on their outside face and a bent strip is installed between the rib and the spar for extra strength. The first task is to drill out and assemble the bent strips to…

Day 43: Elevator Day One (1hr 30m)

Constructing the elevator is the usual assemble, deburr, rivet procedure with the extra twists of building an electric trim on the elevator and installing a servo mechanism. Onward then….. First task of the day was to identify all the parts…

Day 42: Stabiliser Complete (45m)

All that remained at this point was to fold the top skin over and rivet into the pre-drilled holes. I used the ratchet straps again to bring the skin over so that it wouldn’t bend or crease and cleco’d the…